S7-300/400 and WinCC flexible migration

Migration to S7-1500 and WinCC Unified, limiting production downtime and under change control.

What EAi does

S7-300/400 PLCs and WinCC flexible supervision are reaching end of life. EAi migrates them to S7-1500 and WinCC Unified, with a solution defined according to the condition of the installation:

Installation conditionProposed solution
Electrical cabinet and automation compliant and well maintainedSimple PLC replacement for an upgrade
Cabinet too old or showing too many defectsSupply of a new cabinet

On a validated system

A migration changes a qualified system. It is carried out under change control, with an impact analysis and targeted requalification. See Change control and requalification.

Limiting downtime

During a major upgrade, replacing components requires the installation to be shut down. This downtime must be kept to the strict minimum, with full control over how it unfolds. This is why we place great importance on the project preparation phase, carried out in close collaboration with the end-user client.

Let’s discuss your project.

Continuous improvement, revamping, qualification or root cause analysis: let us define together the solution suited to your installation.