Change control, versioning and requalification
Changing a validated system without losing its validation: versioning, change control and targeted requalification.
A validated system evolves: fixes, improvements, migrations. Every change must be controlled so the system stays in its validated state.
Versioning
EAi implements versioning of PLC programs and supervision projects: each version is identified, archived and linked to the change that produced it.
Change control
A change goes through the customer’s change control: description, impact analysis, approval, implementation, verification. EAi provides the technical input for each step.
Requalification
The impact analysis determines which tests to repeat. Targeted requalification avoids requalifying the whole system for a local change.
Quality follow-up of maintenance
Software maintenance interventions are subject to quality follow-up, under maintenance contracts.
Let’s discuss your project.
Continuous improvement, revamping, qualification or root cause analysis: let us define together the solution suited to your installation.

Thierry Pontlevy
Manager, independent consultant in automation and EO sterilization
- +33 6 17 58 24 79
- contact@eai-online.fr
- Bois-Guillaume (76)
- Working in France, across Europe and worldwide