Regulated projects
Method, deliverables and data integrity: what separates qualified automation from automation that simply works.
Methodology: V-model and GAMP 5
From user requirements to qualification: every specification has its test, every deliverable its place in the cycle.
Deliverables
URS/FS, risk analysis, IQ/OQ and software validation: the documents that come with the system.
Data integrity
Audit trail, electronic signatures, user rights: meeting 21 CFR Part 11 in supervision.
Change control, versioning and requalification
Changing a validated system without losing its validation: versioning, change control and targeted requalification.
EO standards: ISO 11135 and EN 1422
The reference standards for ethylene oxide sterilization, built into the control system from the design stage.
Let’s discuss your project.
Continuous improvement, revamping, qualification or root cause analysis: let us define together the solution suited to your installation.

Thierry Pontlevy
Manager, independent consultant in automation and EO sterilization
- +33 6 17 58 24 79
- contact@eai-online.fr
- Bois-Guillaume (76)
- Working in France, across Europe and worldwide