Methodology: V-model and GAMP 5
From user requirements to qualification: every specification has its test, every deliverable its place in the cycle.
Automation in a regulated environment is not just programmed: it is specified, verified and qualified. EAi runs its projects along a V-model, in the spirit of GAMP 5: every document on the descending branch finds its verification on the ascending branch.
- Risk analysis: sets the depth of testing
- User requirements (URS)Performance qualification (PQ)
- Functional specificationOperational qualification (OQ)
- DesignInstallation qualification (IQ)
- Development · S7 PLC and WinCC supervision
Reading the cycle
- On the left, the specifications, from the most general to the most detailed: user requirements (URS), functional specification (FS), design.
- At the bottom, PLC and supervision development.
- On the right, the verifications that answer each specification: testing, installation qualification (IQ), operational qualification (OQ).
- Risk analysis runs through the whole cycle: it sets the depth of testing.
GAMP 5
GAMP 5 offers a risk-based approach and a software classification that determines the expected deliverables.
What it means for you
Documentation is not produced at the end: it moves forward with the project. Your quality department has the specifications before testing, and the protocols before qualification.
Let’s discuss your project.
Continuous improvement, revamping, qualification or root cause analysis: let us define together the solution suited to your installation.

Thierry Pontlevy
Manager, independent consultant in automation and EO sterilization
- +33 6 17 58 24 79
- contact@eai-online.fr
- Bois-Guillaume (76)
- Working in France, across Europe and worldwide